Flip · DIY Kitchen Guide

Kitchen Install-Day Checklist

The manufacturer’s official order — base cabinets first, starting at the corner. Tick each step as you go. (Hanging the uppers first is also fine — installer’s choice.)

Have these ready

Tools & kit
1

Before you start

2

Base cabinets — official first

Start at the corner
3

Wall cabinets

4

Fillers, panels & countertop

5

Doors, handles & toe kick

6

Finishing touches

Leave to a licensed trade

Gas, pressurized water, and 240-volt wiring — plus stone countertop template and install. A permit and a pro for these cost far less than fixing a leak or a fault later.

Not built the plan yet? Design it in 3D at flipkitchen.ca →

Tip — print this and tape it to the wall. Tick each step as you go.